(10). Power supply.
Because the electricity supply system of the province
is sufficient and the city has its own power plant of
85 thousand kilowatts, the supply of electricity can meet
the needs of agriculture, industry and civil usage.
By now, the unit price of electricity for large industrial
usage up to 315 kilowatts is 0.79 RMB with another expense
of 9 RMB as the base fee for each kilowatt. For industrial
projects below 315 kilowatts, the unit price will be 0.83
RMB without any other surplus. The price of electricity
will be lowered at a rate of about 10% according to the
plan of the provincial government.
The following is the standard of charge on capacity applying:
The standard of charge on capacity applying
|
Level
of voltage needed
|
Standard
of Fees
|
|
Grades(kilowatts)
|
General
customers
|
Customers
who build the outer facilities themselves
|
|
0.38/0.2
|
550
|
450
|
|
10
|
450
|
330
|
|
35
|
330
|
180
|
|
110
|
180
|
|
(11). Water supply.
There are lots of rivers and streams all over the whole
city which bring about abundant water resource and convenient
water supply. The capacity of water supply of the Water
Plant is up to 100 thousand tons per day. Both the capacity
or the pressure of water supply can meet the needs of
all sides. Moreover, there are water supply projects in
all towns of the city assuring supply for industrial and
agricultural production and civil life.
At present, the unit price of and capacity fees for water
supply in the city is as follows:
Standard of water capacity fees (RMB/water
meter)
|
Kinds
of water consumers
|
Unit
price
|
|
Civil
usage (including government departments, schools,
hospitals and municipal environmental cleaning department).
|
0.87
|
|
Industry
and commerce (including collective, individual,
joint venture and solely foreign invested enterprises).
|
1.05
|
|
Architectural
enterprises, food and beverage industry, services
and temporary usage.
|
1.38
|
|
Special
industry (including singing and dancing rooms, hairdressing,
beauty parlors, sauna and vehicle cleaning).
|
1.5
|
|
Diameter of water meter
|
Industry and commerce
|
Government departments, schools,
residence and individual enterprises
|
Temporary operation sites and building sites
of individual enterprises
|
|
15
|
3600
|
1600
|
500
|
|
20
|
5760
|
2560
|
800
|
|
25
|
7920
|
3520
|
1100
|
|
40
|
22680
|
10080
|
3150
|
|
50
|
36000
|
16000
|
5000
|
|
80
|
90000
|
40000
|
12500
|
|
100
|
115200
|
51200
|
16000
|
|
150
|
226800
|
100800
|
31500
|
|
200
|
360000
|
160000
|
50000
|
(12). Ports and wharves.
There are three main ports - Gaoming Port, Sanzhou Port
and Fuwan Port in Gaoming City. The Gaoming Port is the
largest one in the city. It is composed by a bulk wharf
and a containerized wharf. Cargo ships go and from the city
everyday and would start additional sailing according to
customers' requests. A new 5,000 tons port will been put
into operation soon. The speedy and luxurious 2-layer passenger
ship travels to and from between Gaomin and Hong Kong every
day, taking only 2 hours 50 minutes. The Gaoming Customs
and other inspection departments provide all-around services
in import and export business.
(13). Labor resource and laborage level.
Gaoming has an abundant labor resource, with a labor force
of 90 thousand people (excluding those from outside the
city) and 8 thousand professionals in all specialties.
At present, the laborage level is about 500 HK$ per month
and should be a little lower in remote area.
(14). Usage of land.
The terms of land usage differ from various industries.
It will be as long as 40 years for projects involving in
commerce, tourism and entertainment, 70 years for real estate
and productive projects with high technology and with a
long term of capital repayment and 50 years for other industries.
The land resource of the city is more than abundant and
the price of land access could be as low as 10 to 20 thousand
regarding to different places. |